ADC12DJ2700EVM

Mfr. #: ADC12DJ2700EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools ADC12DJ2700EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADC12DJ2700EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC12DJ2700EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.178015 oz of Unit Weight

ADC12DJ2700EVM Image

ADC12DJ2700EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC12DJ2700EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • Shipping Restrictions:
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC12DJ2700
  • Operating Supply Voltage: 5 V
  • Series: ADC12DJ2700
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.178015 oz

ADC12DJ2700EVM

ADC12DJ2700EVM Specifications

ADC12DJ2700EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.178015 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top