ADC3244EVM

Mfr. #: ADC3244EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools ADC3244 Eval Module
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADC3244EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3244EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 1.8 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Compatible with ADC3244. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.138035 oz of Unit Weight

ADC3244EVM Image

ADC3244EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3244EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADC3244
  • Operating Supply Voltage: 1.8 V
  • Series: ADC3423
  • Brand: Texas Instruments
  • Interface Type: Serial
  • For Use With: ADC3244
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.138035 oz

ADC3244EVM

ADC3244EVM Specifications

ADC3244EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Serial.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is ADC3244.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.138035 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top