ADS1202EVM

Mfr. #: ADS1202EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools ADS1202 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS1202EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1202EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS1202EVM Image

ADS1202EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1202EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS1202
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS1202EVM

ADS1202EVM Specifications

ADS1202EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top