ADS1256EVM-PDK

Mfr. #: ADS1256EVM-PDK
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools ADS1256 Perf Demo Kit
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS1256EVM-PDK Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1256EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. 1.8 V to 3.3 V, 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Serial, USB Compatible with ADS1256EVM. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS1256EVM-PDK Image

ADS1256EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1256EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: E
  • Product: Demonstration Kits
  • Type: ADC
  • Tool Is For Evaluation Of: ADS1256
  • Operating Supply Voltage: 1.8 V to 3.3 V, 5 V
  • Series: ADS1256
  • Brand: Texas Instruments
  • Interface Type: Serial, USB
  • For Use With: ADS1256EVM
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS1256EVM-PDK

ADS1256EVM-PDK Specifications

ADS1256EVM-PDK FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Demonstration Kits

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V to 3.3 V, 5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is Serial, USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is ADS1256EVM.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top