ADS42JB69EVM

Mfr. #: ADS42JB69EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools ADS42JB69EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS42JB69EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS42JB69EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Compatible with ADS42JB69. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS42JB69EVM Image

ADS42JB69EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS42JB69EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS42JB69
  • Operating Supply Voltage: 5 V
  • Series: ADS42JB69
  • Brand: Texas Instruments
  • For Use With: ADS42JB69
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS42JB69EVM

ADS42JB69EVM Specifications

ADS42JB69EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is ADS42JB69.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top