ADS5404EVM

Mfr. #: ADS5404EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools ADS5404EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS5404EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5404EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Compatible with ADS540x, ADS54T0x. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS5404EVM Image

ADS5404EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5404EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC
  • Tool Is For Evaluation Of: ADS540x, ADS54T0x
  • Operating Supply Voltage: 5 V
  • Description/Function: Provides a platform for evaluating a two-channel, 12-bit ADC operating at sampling rates of up to 800 MSPS
  • Series: ADS5404
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • For Use With: ADS540x, ADS54T0x
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS5404EVM

ADS5404EVM Specifications

ADS5404EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI, USB.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is ADS540x, ADS54T0x.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top