ADS54T04EVM

Mfr. #: ADS54T04EVM
Hersteller: Texas Instruments
Beschreibung: RF Development Tools ADS54T04 EVAL MOD
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS54T04EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS54T04EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the RF Receivers type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Compatible with ADS540x, ADS54T0x. RF Development Tools product type 1 of 100 Development Tools as subcategory

ADS54T04EVM Image

ADS54T04EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS54T04EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: RF Receivers
  • Tool Is For Evaluation Of: ADS540x, ADS54T0x
  • Operating Supply Voltage: 5 V
  • Series: ADS54T04
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • For Use With: ADS540x, ADS54T0x
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS54T04EVM

ADS54T04EVM Specifications

ADS54T04EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is RF Receivers.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SPI, USB.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is ADS540x, ADS54T0x.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is RF Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top