ADS62P28EVM

Mfr. #: ADS62P28EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools ADS62P28 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS62P28EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS62P28EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS62P28EVM Image

ADS62P28EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS62P28EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS62P28EVM

ADS62P28EVM Specifications

ADS62P28EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top