ADS62P43EVM

Mfr. #: ADS62P43EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools ADS62P43 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS62P43EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS62P43EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the ADC type. 3.3 V to 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SMA, SPI Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS62P43EVM Image

ADS62P43EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS62P43EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: ADC
  • Tool Is For Evaluation Of: ADS62P43
  • Operating Supply Voltage: 3.3 V to 5 V
  • Series: ADS62P43
  • Brand: Texas Instruments
  • Interface Type: SMA, SPI
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS62P43EVM

ADS62P43EVM Specifications

ADS62P43EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is SMA, SPI.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top