| Mfr. #: | ADS7044EVM-PDK |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Data Conversion IC Development Tools 12-bit, diff Input SAR ADC Demo Kit |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | ADS7044EVM-PDK Datenblatt |


This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. 1.8 V to 3.6 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI Compatible with ADS7044. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7044EVM-PDK Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Demonstration Kits.
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V to 3.6 V
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is SPI.
A: What is the For Use With of the product?
Q: The For Use With of the product is ADS7044.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.