ADS9110EVM-PDK

Mfr. #: ADS9110EVM-PDK
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools ADS9110EVM-PDK
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: ADS9110EVM-PDK Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS9110EVM-PDK Overview

This product is manufactured by Texas Instruments. Demonstration Kits This device belongs to the ADC type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI, USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

ADS9110EVM-PDK Image

ADS9110EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS9110EVM-PDK Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Demonstration Kits
  • Type: ADC
  • Tool Is For Evaluation Of: ADS9110
  • Operating Supply Voltage: 3.3 V
  • Description/Function: Evaluation board for the ADS9110 SAR ADC
  • Series: ADS9110
  • Brand: Texas Instruments
  • Interface Type: I2C, SPI, USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

ADS9110EVM-PDK

ADS9110EVM-PDK Specifications

ADS9110EVM-PDK FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Demonstration Kits

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, SPI, USB

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top