| Mfr. #: | BQ24092EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools BQ24092 Eval Mod |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | BQ24092EVM Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 4.45 V to 6.45 V Input Voltage Output Voltage is 4.2 V Output current: 540 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ24092EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Battery Management.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 4.45 V to 6.45 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 4.2 V.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 540 mA
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools