| Mfr. #: | BQ27441EVM-G1B |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools BQ27441EVM-G1B |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | BQ27441EVM-G1B Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Compatible with BQ27441-G1B. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.250213 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ27441EVM-G1B Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Battery Management
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Interface Type?
Q: Yes, the product's Interface Type is indeed I2C
A: Is the cutoff frequency of the product For Use With?
Q: Yes, the product's For Use With is indeed BQ27441-G1B
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.250213 oz.