BQ33100EVM-001

Mfr. #: BQ33100EVM-001
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools Eval Mod for bq33100
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: BQ33100EVM-001 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ33100EVM-001 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Battery Management type. 12 V Input Voltage Dimensions of 76.2 mm x 50.8 mm Output current: 7 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Compatible with EV2300. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.202248 oz of Unit Weight

BQ33100EVM-001 Image

BQ33100EVM-001

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ33100EVM-001 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Battery Management
  • Tool Is For Evaluation Of: BQ33100
  • Input Voltage: 12 V
  • Description/Function: The BQ33100EVM-001 evaluation module (EVM) is a complete evaluation system for the bq33100 super capacitor manager
  • Dimensions: 76.2 mm x 50.8 mm
  • Output Current: 7 A
  • Series: BQ33100
  • Brand: Texas Instruments
  • Interface Type: USB
  • For Use With: EV2300
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.202248 oz

BQ33100EVM-001

BQ33100EVM-001 Specifications

BQ33100EVM-001 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Battery Management.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 12 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 76.2 mm x 50.8 mm

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 7 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is EV2300.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.202248 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top