CDC3S04EVM

Mfr. #: CDC3S04EVM
Hersteller: Texas Instruments
Beschreibung: Clock & Timer Development Tools CDC3S04EVM Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: CDC3S04EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDC3S04EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Buffers type. Frequency range: 52 MHz Texas Instruments is a trusted brand for quality electronics Interface Type: I2C The minimum operating temperature of this product is - 30 C. 2.2 V to 3.6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDC3S04EVM Image

CDC3S04EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDC3S04EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Clock Buffers
  • Tool Is For Evaluation Of: CDC3S04
  • Frequency: 52 MHz
  • Series: CDC3S04
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Minimum Operating Temperature: - 30 C
  • Operating Supply Voltage: 2.2 V to 3.6 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDC3S04EVM

CDC3S04EVM Specifications

CDC3S04EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Buffers.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 52 MHz

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 30 C

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 2.2 V to 3.6 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Clock & Timer Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top