CDCLVP1102EVM

Mfr. #: CDCLVP1102EVM
Hersteller: Texas Instruments
Beschreibung: Clock & Timer Development Tools CDCLVP1102 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: CDCLVP1102EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP1102EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Clock Buffers type. Frequency range: 200 MHz, 2 GHz Texas Instruments is a trusted brand for quality electronics 2.375 V to 3.6 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

CDCLVP1102EVM Image

CDCLVP1102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP1102EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Clock Buffers
  • Tool Is For Evaluation Of: CDCLVP1102
  • Frequency: 200 MHz, 2 GHz
  • Series: CDCLVP1102
  • Brand: Texas Instruments
  • Operating Supply Voltage: 2.375 V to 3.6 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

CDCLVP1102EVM

CDCLVP1102EVM Specifications

CDCLVP1102EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Buffers.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 200 MHz, 2 GHz.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.375 V to 3.6 V

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Clock & Timer Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top