DAC3161EVM

Mfr. #: DAC3161EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools DAC3161EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DAC3161EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC3161EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the DAC type. 1.8 V, 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: Parallel LVDS Compatible with TSW1400, DAC3161. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

DAC3161EVM Image

DAC3161EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC3161EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: DAC
  • Tool Is For Evaluation Of: DAC31x1
  • Operating Supply Voltage: 1.8 V, 3.3 V
  • Description/Function: DAC3161 Evaluation Module
  • Series: DAC3161
  • Brand: Texas Instruments
  • Interface Type: Parallel LVDS
  • For Use With: TSW1400, DAC3161
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DAC3161EVM

DAC3161EVM Specifications

DAC3161EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.8 V, 3.3 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Parallel LVDS.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TSW1400, DAC3161

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 85 C

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top