DAC38RF86EVM

Mfr. #: DAC38RF86EVM
Hersteller: Texas Instruments
Beschreibung: Data Conversion IC Development Tools DAC38RF86EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DAC38RF86EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC38RF86EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the DAC type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 11.887325 oz of Unit Weight

DAC38RF86EVM Image

DAC38RF86EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC38RF86EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: DAC
  • Tool Is For Evaluation Of: DAC38RF86
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluates the DAC38RF86 digital-to-analog converter
  • Series: DAC38RF87
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 11.887325 oz

DAC38RF86EVM

DAC38RF86EVM Specifications

DAC38RF86EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 11.887325 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top