| Mfr. #: | DAC8811EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Data Conversion IC Development Tools DAC8811 Eval Mod |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | DAC8811EVM Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the DAC type. 5 V to 15 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.094823 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8811EVM Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is DAC.
A: Is the cutoff frequency of the product Operating Supply Voltage?
Q: Yes, the product's Operating Supply Voltage is indeed 5 V to 15 V
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Data Conversion IC Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 0.094823 oz.