DLPDLCR2010EVM

Mfr. #: DLPDLCR2010EVM
Hersteller: Texas Instruments
Beschreibung: Display Development Tools DLP LightCrafter Display 2010 EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DLPDLCR2010EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DLPDLCR2010EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 5 V operating supply voltage range Interface Type: Audio, HDMI, I2C, JTAG, USB Texas Instruments is a trusted brand for quality electronics Display Development Tools product type 1 of 100 Development Tools as subcategory The product's DLP is Blue Gecko. 1. 1.247 lbs of Unit Weight

DLPDLCR2010EVM Image

DLPDLCR2010EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DLPDLCR2010EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: DLP2010
  • Operating Supply Voltage: 5 V
  • Interface Type: Audio, HDMI, I2C, JTAG, USB
  • Description/Function: DLP LightCrafter display 2010 evaluation module
  • Series: DLPDLCR2010
  • Brand: Texas Instruments
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: DLP
  • Unit Weight: 1.247 lbs

DLPDLCR2010EVM

DLPDLCR2010EVM Specifications

DLPDLCR2010EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 5 V.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is Audio, HDMI, I2C, JTAG, USB.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Display Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is DLP.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 1.247 lbs

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top