DRV8432EVM

Mfr. #: DRV8432EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools DRV8432 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DRV8432EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8432EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Motor / Motion Controllers & Drivers type. 12 V Input Voltage Output Voltage is 0 V to 52.5 V Output current: 14 A Texas Instruments is a trusted brand for quality electronics Compatible with DRV8432. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8432EVM Image

DRV8432EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8432EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Motor / Motion Controllers & Drivers
  • Tool Is For Evaluation Of: DRV8432
  • Input Voltage: 12 V
  • Output Voltage: 0 V to 52.5 V
  • Description/Function: Dual full-bridge PWM motor driver
  • Output Current: 14 A
  • Series: DRV8432
  • Brand: Texas Instruments
  • For Use With: DRV8432
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8432EVM

DRV8432EVM Specifications

DRV8432EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 12 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 0 V to 52.5 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 14 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is DRV8432.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top