DRV8702D-Q1EVM

Mfr. #: DRV8702D-Q1EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools DRV8702D-Q1EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DRV8702D-Q1EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8702D-Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Gate Drivers type. 5.9 V to 45 V Input Voltage Output Voltage is 3.3 V Output current: 15 A Texas Instruments is a trusted brand for quality electronics Interface Type: USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

DRV8702D-Q1EVM Image

DRV8702D-Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8702D-Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Gate Drivers
  • Tool Is For Evaluation Of: DRV8702D-Q1
  • Input Voltage: 5.9 V to 45 V
  • Output Voltage: 3.3 V
  • Description/Function: Evaluates the DRV8702D-Q1 half-bridge gate driver
  • Output Current: 15 A
  • Series: DRV8702D-Q1
  • Brand: Texas Instruments
  • Interface Type: USB
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DRV8702D-Q1EVM

DRV8702D-Q1EVM Specifications

DRV8702D-Q1EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Gate Drivers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5.9 V to 45 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3.3 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 15 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top