DS125DF111EVM

Mfr. #: DS125DF111EVM
Hersteller: Texas Instruments
Beschreibung: Interface Development Tools 9.8-12.5Gbps Retimer Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DS125DF111EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DS125DF111EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Retimer type. Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Interface Type: Serial Compatible with DS125DF111. 3.3 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

DS125DF111EVM Image

DS125DF111EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DS125DF111EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Retimer
  • Tool Is For Evaluation Of: DS125DF111
  • Packaging: Bulk
  • Description/Function: Dual channel retimer with integrated signal conditioning
  • Series: DS125DF111
  • Brand: Texas Instruments
  • Interface Type: Serial
  • For Use With: DS125DF111
  • Operating Supply Voltage: 3.3 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

DS125DF111EVM

DS125DF111EVM Specifications

DS125DF111EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Retimer.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is Serial.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is DS125DF111.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top