FDC2214PROXSEN-EVM

Mfr. #: FDC2214PROXSEN-EVM
Hersteller: Texas Instruments
Beschreibung: Touch Sensor Development Tools FDC2214PROXSEN-EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: FDC2214PROXSEN-EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
FDC2214PROXSEN-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Capacitive Touch, Proximity Sensor type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: JTAG, UART Compatible with FDC2214, MSP430FR5969, TPS61029. Touch Sensor Development Tools product type 1 of 100 Development Tools as subcategory

FDC2214PROXSEN-EVM Image

FDC2214PROXSEN-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

FDC2214PROXSEN-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Touch Sensor Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Capacitive Touch, Proximity Sensor
  • Tool Is For Evaluation Of: FDC2214
  • Operating Supply Voltage: 3.3 V
  • Description/Function: FDC2214 proximity and capacitive touch evaluation module
  • Series: FDC2214
  • Brand: Texas Instruments
  • Interface Type: JTAG, UART
  • For Use With: FDC2214, MSP430FR5969, TPS61029
  • Product Type: Touch Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

FDC2214PROXSEN-EVM

FDC2214PROXSEN-EVM Specifications

FDC2214PROXSEN-EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Capacitive Touch, Proximity Sensor.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed JTAG, UART

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed FDC2214, MSP430FR5969, TPS61029

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Touch Sensor Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis