INA1620EVM

Mfr. #: INA1620EVM
Hersteller: Texas Instruments
Beschreibung: Audio IC Development Tools INA1620 EVALUATION MODULE
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: INA1620EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA1620EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Operational Amplifier type. 15 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

INA1620EVM Image

INA1620EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA1620EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Operational Amplifier
  • Tool Is For Evaluation Of: INA1620
  • Operating Supply Voltage: 15 V
  • Series: INA1620
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

INA1620EVM

INA1620EVM Specifications

INA1620EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Operational Amplifier.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 15 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

14 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top