IO-EXPANDER-EVM

Mfr. #: IO-EXPANDER-EVM
Hersteller: Texas Instruments
Beschreibung: Interface Development Tools I2C and SMBus IO Expander EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: IO-EXPANDER-EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
IO-EXPANDER-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the I/O Expander type. Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, Serial, SMBus, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. 1.65 V to 5.5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

IO-EXPANDER-EVM Image

IO-EXPANDER-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

IO-EXPANDER-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: I/O Expander
  • Tool Is For Evaluation Of: TCA6408A, TCA6416A, TCA6424A, TCA9534, TCA9534A, TCA9535, TCA9538, TCA9539, TCA9554, TCA9554A, TCA9555
  • Description/Function: Allows for evaluation of the I/O expander line of TI parts
  • Series: TCA6424A, TCA9539
  • Brand: Texas Instruments
  • Interface Type: I2C, Serial, SMBus, USB
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Operating Supply Voltage: 1.65 V to 5.5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

IO-EXPANDER-EVM

IO-EXPANDER-EVM Specifications

IO-EXPANDER-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is I/O Expander.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, Serial, SMBus, USB.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.65 V to 5.5 V.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top