LM3017EVM

Mfr. #: LM3017EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools LM3017EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LM3017EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM3017EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 8 V to 12 V Input Voltage Output Voltage is 15 V Bulk packaging for easy dispensing Output current: 1 A Texas Instruments is a trusted brand for quality electronics Compatible with LM3017. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LM3017EVM Image

LM3017EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM3017EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: LM3017LE
  • Input Voltage: 8 V to 12 V
  • Output Voltage: 15 V
  • Packaging: Bulk
  • Description/Function: LM3017 high-efficiency low-side controller with true shutdown evaluation module
  • Output Current: 1 A
  • Series: LM3017
  • Brand: Texas Instruments
  • For Use With: LM3017
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LM3017EVM

LM3017EVM Specifications

LM3017EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 8 V to 12 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 15 V

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 1 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is LM3017.

  • A: Is the cutoff frequency of the product Maximum Operating Temperature?

    Q: Yes, the product's Maximum Operating Temperature is indeed + 125 C

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top