| Mfr. #: | LM3243EVM/NOPB |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools LM3243 Eval Mod |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | LM3243EVM/NOPB Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 2.7 V to 5.5 V Input Voltage Output Voltage is 400 mV to 3.6 V Bulk packaging for easy dispensing Output current: 0 mA to 2.5 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM3243EVM/NOPB Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Voltage Regulators - Switching Regulators.
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 2.7 V to 5.5 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 400 mV to 3.6 V
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: What is the Output Current of the product?
Q: The Output Current of the product is 0 mA to 2.5 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.