LM5166EVM-C33A

Mfr. #: LM5166EVM-C33A
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools LM5166EVM-C33A 500MA
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LM5166EVM-C33A Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM5166EVM-C33A Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 3 V to 65 V Input Voltage Output Voltage is 3.3 V Output current: 500 mA Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LM5166EVM-C33A Image

LM5166EVM-C33A

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM5166EVM-C33A Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LM5166
  • Input Voltage: 3 V to 65 V
  • Output Voltage: 3.3 V
  • Output Current: 500 mA
  • Series: LM5166
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LM5166EVM-C33A

LM5166EVM-C33A Specifications

LM5166EVM-C33A FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 3 V to 65 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 3.3 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 500 mA.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top