LM73605EVM-5V-2MHZ

Mfr. #: LM73605EVM-5V-2MHZ
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools LM73605 EvalMod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LM73605EVM-5V-2MHZ Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM73605EVM-5V-2MHZ Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 6 V to 36 V Input Voltage Output Voltage is 5 V Output current: 5 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LM73605EVM-5V-2MHZ Image

LM73605EVM-5V-2MHZ

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM73605EVM-5V-2MHZ Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LM73605
  • Input Voltage: 6 V to 36 V
  • Output Voltage: 5 V
  • Output Current: 5 A
  • Series: LM73605
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LM73605EVM-5V-2MHZ

LM73605EVM-5V-2MHZ Specifications

LM73605EVM-5V-2MHZ FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 6 V to 36 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 5 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top