LMH2832EVM-75

Mfr. #: LMH2832EVM-75
Hersteller: Texas Instruments
Beschreibung: Amplifier IC Development Tools LMH2832EVM-75
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LMH2832EVM-75 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMH2832EVM-75 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Programmable Gain Amplifiers type. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: SPI, USB Compatible with LMH2832. Amplifier IC Development Tools product type 1 of 100 Development Tools as subcategory

LMH2832EVM-75 Image

LMH2832EVM-75

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMH2832EVM-75 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Amplifier IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Programmable Gain Amplifiers
  • Tool Is For Evaluation Of: LMH2832
  • Operating Supply Voltage: 5 V
  • Description/Function: Evaluates the LMH2832 in a 75 Ohm environment
  • Series: LMH2832
  • Brand: Texas Instruments
  • Interface Type: SPI, USB
  • For Use With: LMH2832
  • Operating Supply Current: 204 mA
  • Product Type: Amplifier IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMH2832EVM-75

LMH2832EVM-75 Specifications

LMH2832EVM-75 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Programmable Gain Amplifiers

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is SPI, USB.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is LMH2832.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Amplifier IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top