LMX2571EVM

Mfr. #: LMX2571EVM
Hersteller: Texas Instruments
Beschreibung: Clock & Timer Development Tools LMX2571 Eval Mod incl USB2ANY adapter
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LMX2571EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMX2571EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Frequency Synthesizers type. Frequency range: 10 MHz to 1.4 GHz Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics 3.3 V operating supply voltage range Clock & Timer Development Tools product type 1 of 100 Development Tools as subcategory

LMX2571EVM Image

LMX2571EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMX2571EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Clock & Timer Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Frequency Synthesizers
  • Tool Is For Evaluation Of: LMX2571
  • Frequency: 10 MHz to 1.4 GHz
  • Packaging: Bulk
  • Description/Function: LMX2571 evaluation module including USB2ANY adapter
  • Series: LMX2571
  • Brand: Texas Instruments
  • Operating Supply Voltage: 3.3 V
  • Product Type: Clock & Timer Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMX2571EVM

LMX2571EVM Specifications

LMX2571EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Frequency Synthesizers.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 10 MHz to 1.4 GHz.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 3.3 V

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Clock & Timer Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top