LMZM33603EVM

Mfr. #: LMZM33603EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools LMZ33603,4V-36V,1V- 13.5VOutput3AEvalMod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LMZM33603EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMZM33603EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4 V to 36 V Input Voltage Output Voltage is 1 V to 13.5 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

LMZM33603EVM Image

LMZM33603EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMZM33603EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: LMZM33603
  • Input Voltage: 4 V to 36 V
  • Output Voltage: 1 V to 13.5 V
  • Description/Function: Evaluates the LMZM33603 DC-DC power module
  • Output Current: 3 A
  • Series: LMZM33603
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

LMZM33603EVM

LMZM33603EVM Specifications

LMZM33603EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 4 V to 36 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 1 V to 13.5 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 3 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

40 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top