LP5912DRV33EVM

Mfr. #: LP5912DRV33EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools LP5912DRV33EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LP5912DRV33EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP5912DRV33EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the LDO Voltage Regulators type. 3.8 V to 6.5 V Input Voltage Output Voltage is 3.3 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 6.088 lbs of Unit Weight

LP5912DRV33EVM Image

LP5912DRV33EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP5912DRV33EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: LDO Voltage Regulators
  • Tool Is For Evaluation Of: LP5912DRV
  • Input Voltage: 3.8 V to 6.5 V
  • Output Voltage: 3.3 V
  • Series: LP5912
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 6.088 lbs

LP5912DRV33EVM

LP5912DRV33EVM Specifications

LP5912DRV33EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed LDO Voltage Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 3.8 V to 6.5 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 6.088 lbs.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top