| Mfr. #: | LP8754EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools LP8754EVM |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | LP8754EVM Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 5 V Input Voltage Output Voltage is 1.67 V Bulk packaging for easy dispensing Output current: 10 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP8754EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators
A: What is the Input Voltage of the product?
Q: The Input Voltage of the product is 5 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 1.67 V
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 10 A
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C, USB.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.