TLV320AIC1107EVM

Mfr. #: TLV320AIC1107EVM
Hersteller: Texas Instruments
Beschreibung: Audio IC Development Tools TLV320AIC1107 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TLV320AIC1107EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLV320AIC1107EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TLV320AIC1107EVM Image

TLV320AIC1107EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLV320AIC1107EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio
  • Tool Is For Evaluation Of: TLV320AIC1107
  • Operating Supply Voltage: 3.3 V
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TLV320AIC1107EVM

TLV320AIC1107EVM Specifications

TLV320AIC1107EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top