TPA3106D1EVM

Mfr. #: TPA3106D1EVM
Hersteller: Texas Instruments
Beschreibung: Audio IC Development Tools TPA3106D1EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPA3106D1EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3106D1EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 10 V to 26 V operating supply voltage range Output power: 40 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3106D1EVM Image

TPA3106D1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3106D1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: E
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3106D1
  • Operating Supply Voltage: 10 V to 26 V
  • Output Power: 40 W
  • Series: TPA3106D1
  • Brand: Texas Instruments
  • Operating Supply Current: 4 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3106D1EVM

TPA3106D1EVM Specifications

TPA3106D1EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 10 V to 26 V

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 40 W.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top