TPA3125D2EVM

Mfr. #: TPA3125D2EVM
Hersteller: Texas Instruments
Beschreibung: Audio IC Development Tools TPA3125D2EVM Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPA3125D2EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3125D2EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 10 V to 26 V operating supply voltage range Output power: 10 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3125D2EVM Image

TPA3125D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3125D2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3125D2
  • Operating Supply Voltage: 10 V to 26 V
  • Output Power: 10 W
  • Series: TPA3125D2
  • Brand: Texas Instruments
  • Operating Supply Current: 3 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3125D2EVM

TPA3125D2EVM Specifications

TPA3125D2EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 10 V to 26 V.

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 10 W.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top