TPA3251D2EVM

Mfr. #: TPA3251D2EVM
Hersteller: Texas Instruments
Beschreibung: Audio IC Development Tools TPA3251D2EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPA3251D2EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3251D2EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 18 V to 38 V operating supply voltage range Tube packaging for easy dispensing Dimensions of 140 mm x 120 mm Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3251D2EVM Image

TPA3251D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3251D2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3251D2
  • Operating Supply Voltage: 18 V to 38 V
  • Packaging: Tube
  • Description/Function: TPA3251D2 PurePath ultra-high definition evaluation module
  • Dimensions: 140 mm x 120 mm
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3251D2EVM

TPA3251D2EVM Specifications

TPA3251D2EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 18 V to 38 V

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Tube.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 140 mm x 120 mm.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Audio IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

12 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top