TPA3255EVM

Mfr. #: TPA3255EVM
Hersteller: Texas Instruments
Beschreibung: Audio IC Development Tools TPA3255EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPA3255EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3255EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Audio Amplifier type. 14 V to 53.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory The product's PurePath is Blue Gecko.

TPA3255EVM Image

TPA3255EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3255EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3255
  • Operating Supply Voltage: 14 V to 53.5 V
  • Series: TPA3255
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: PurePath

TPA3255EVM

TPA3255EVM Specifications

TPA3255EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 14 V to 53.5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is PurePath.

23 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top