TPA6135A2EVM

Mfr. #: TPA6135A2EVM
Hersteller: Texas Instruments
Beschreibung: Audio IC Development Tools TPA6135A2 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPA6135A2EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA6135A2EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 2.5 V to 5.5 V operating supply voltage range Output power: 25 mW Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA6135A2EVM Image

TPA6135A2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA6135A2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA6135A2
  • Operating Supply Voltage: 2.5 V to 5.5 V
  • Output Power: 25 mW
  • Series: TPA6135A2
  • Brand: Texas Instruments
  • Operating Supply Current: 500 mA
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA6135A2EVM

TPA6135A2EVM Specifications

TPA6135A2EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifier

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.5 V to 5.5 V

  • A: What is the Output Power of the product?

    Q: The Output Power of the product is 25 mW.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top