TPS22958EVM

Mfr. #: TPS22958EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS22958EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS22958EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22958EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 600 mV to 5.5 V Input Voltage Output Voltage is 5.5 V Bulk packaging for easy dispensing Output current: 4 A/6 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 105 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.046056 oz of Unit Weight

TPS22958EVM Image

TPS22958EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22958EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22958
  • Input Voltage: 600 mV to 5.5 V
  • Output Voltage: 5.5 V
  • Packaging: Bulk
  • Output Current: 4 A/6 A
  • Series: TPS22958
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 105 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.046056 oz

TPS22958EVM

TPS22958EVM Specifications

TPS22958EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Load Switches.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 600 mV to 5.5 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 5.5 V

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 4 A/6 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 105 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.046056 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top