| Mfr. #: | TPS2388EVM-612 |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools TPS2388 EvalMod for 802.3at PoE PSE apps |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TPS2388EVM-612 Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Over Ethernet type. 48 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.466062 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2388EVM-612 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Power Over Ethernet.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 48 V
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Interface Type of the product?
Q: The Interface Type of the product is I2C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: What is the Unit Weight of the product?
Q: The Unit Weight of the product is 1.466062 oz.