TPS2391EVM

Mfr. #: TPS2391EVM
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools Simple -48V Hot Swap Contr EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS2391EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2391EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Hot Swap Voltage Controllers type. - 48 V Input Voltage Dimensions of 81.9 mm x 56.8 mm Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2391EVM Image

TPS2391EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2391EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Hot Swap Voltage Controllers
  • Tool Is For Evaluation Of: TPS2391
  • Input Voltage: - 48 V
  • Dimensions: 81.9 mm x 56.8 mm
  • Series: TPS2391
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2391EVM

TPS2391EVM Specifications

TPS2391EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Hot Swap Voltage Controllers.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is - 48 V.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 81.9 mm x 56.8 mm.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top