TPS2544EVM-064

Mfr. #: TPS2544EVM-064
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS2544 EVAL MOD
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS2544EVM-064 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2544EVM-064 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Load Switches type. Texas Instruments is a trusted brand for quality electronics Compatible with TPS2544. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2544EVM-064 Image

TPS2544EVM-064

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2544EVM-064 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS2544
  • Description/Function: USB charging port controller and power switch
  • Series: TPS2544
  • Brand: Texas Instruments
  • For Use With: TPS2544
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2544EVM-064

TPS2544EVM-064 Specifications

TPS2544EVM-064 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Load Switches.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS2544

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top