TPS2559EVM-624

Mfr. #: TPS2559EVM-624
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools Evaluation Module
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS2559EVM-624 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2559EVM-624 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Distributions type. 2.5 V to 6.5 V Input Voltage Output current: 5 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.038013 oz of Unit Weight

TPS2559EVM-624 Image

TPS2559EVM-624

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2559EVM-624 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Power Distributions
  • Tool Is For Evaluation Of: TPS2559
  • Input Voltage: 2.5 V to 6.5 V
  • Description/Function: TPS2559 precision adjustable current limited power distribution switch
  • Output Current: 5 A
  • Series: TPS2559
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.038013 oz

TPS2559EVM-624

TPS2559EVM-624 Specifications

TPS2559EVM-624 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Distributions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.5 V to 6.5 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 5 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.038013 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top