TPS3847085EVM-577

Mfr. #: TPS3847085EVM-577
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS3847085EVM-577
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS3847085EVM-577 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS3847085EVM-577 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Supervisory Circuits type. 4.5 V to 18 V Input Voltage Output Voltage is - Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS3847085EVM-577 Image

TPS3847085EVM-577

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS3847085EVM-577 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Supervisory Circuits
  • Tool Is For Evaluation Of: TPS3847085
  • Input Voltage: 4.5 V to 18 V
  • Output Voltage: -
  • Packaging: Bulk
  • Series: TPS3847085
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS3847085EVM-577

TPS3847085EVM-577 Specifications

TPS3847085EVM-577 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Supervisory Circuits.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4.5 V to 18 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed -

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top