TPS40077EVM-001

Mfr. #: TPS40077EVM-001
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS40077 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS40077EVM-001 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS40077EVM-001 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 1.8 V Dimensions of 76.2 mm x 50.8 mm Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.225076 oz of Unit Weight

TPS40077EVM-001 Image

TPS40077EVM-001

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40077EVM-001 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS40077
  • Input Voltage: 12 V
  • Output Voltage: 1.8 V
  • Dimensions: 76.2 mm x 50.8 mm
  • Series: TPS40077
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.225076 oz

TPS40077EVM-001

TPS40077EVM-001 Specifications

TPS40077EVM-001 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Switching Controllers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 12 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.8 V

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 76.2 mm x 50.8 mm

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.225076 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top