| Mfr. #: | TPS40200EVM-001 |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Power Management IC Development Tools Non-Sync Buck Contr Eval Mod |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TPS40200EVM-001 Datenblatt |


This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 3.3 V Dimensions of 53.8 mm x 35.6 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.197230 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40200EVM-001 Specifications
A: Is the cutoff frequency of the product Manufacturer?
Q: Yes, the product's Manufacturer is indeed Texas Instruments
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Switching Controllers.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 12 V.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 3.3 V.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 53.8 mm x 35.6 mm.
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.197230 oz