TPS43060EVM-199

Mfr. #: TPS43060EVM-199
Hersteller: Texas Instruments
Beschreibung: Power Management IC Development Tools TPS43060 EVAL MOD
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS43060EVM-199 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS43060EVM-199 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Switching Controllers type. 24 V Input Voltage Output Voltage is 40 V Output current: 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS43060. The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS43060EVM-199 Image

TPS43060EVM-199

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS43060EVM-199 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS43060
  • Input Voltage: 24 V
  • Output Voltage: 40 V
  • Description/Function: Fully assembled and tested circuit for evaluating the TPS43060
  • Output Current: 3 A
  • Series: TPS43060
  • Brand: Texas Instruments
  • For Use With: TPS43060
  • Maximum Operating Temperature: + 150 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS43060EVM-199

TPS43060EVM-199 Specifications

TPS43060EVM-199 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Switching Controllers

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 24 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 40 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 3 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS43060.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 150 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
Top